
2010 TRAVELING FLOAT
CONSTRUCTION PROJECT
| Carol Kapua | Traveling Float Committee Chairperson |
| Chuck Walser | Truck & Float Chairperson |
| Ken & Glenda Goedde, Goedde Design | Consultant |
| Tom Grady, Greg Edwards, Walter Woodward, Carol Kapua, | |
|
Sheila Thompson, Chuck Walser, DC Clemmons, Darrell Wigdahl, |
|
|
John & Jodi Hiatt, Mike Grady, Jon Edwards, Amy Edwards, |
|
|
Payton & Tylene Edwards, Bobbi Young, Judy & Richard Anderson, |
|
|
Linda Farrington, Arvin Van Beek, Angie Miller |
|
|
and with the help of many others! |
|

by Tom Grady:
Greg and Walter removed more unnecessary steel components from the float chassis this week and as you can see from the pictures - the chassis is down to the bare bones.
The front brake rotors arrived and Greg installed them.
I flew up from Las Vegas and Greg, Walter and I met on Wednesday night. We solved how the footprint will look, but most importantly - how it will fold up over itself. I think that the float traveling committee will be pleased with our thoughts as we incorporated ease of assembly/disassembly and storage of parts into the same role. It will be unusual, to be sure. Be sure to watch as this develops! We also came up with a super idea to add an element to make our float an "one-of-a-kind" on the circuit. It's a "float guy" secret.....but I guarantee you...it's a "WOW!"....everyone will talk about it.....I don't think that it has ever been done.
We also pulled the generator out for it's annual service, which hasn't been done for a while. Sheila.....don't they make these 6500 watt generators any lighter????
I went on a material and tool purchase run Thursday morning. Met a really nice guy at Pacific Welding Supplies in Fife, Eric Konnersman (Store Manager). He gave us a discount on the Argon gas when I told him what our project was and he has a nice business on the tide flats in Tacoma.
Carol, Sheila and Chuck came down on Thursday and we went to lunch and finalized the design idea. We worked off of Angie's design, slightly modifying it. I think that we have a great concept and it will work and we will all be proud of it.
Chuck did a walk around the float and I went over everything that we were doing and he pointed out his concerns and I took notes. At least the mechanical portion of the float should be in great running order for years to come.
| Finalize design | Design/layout float footprint | Pull generator for servicing |
| Checklist of animation needs | FINAL Model folding sides | Material/tool purchases |
| Replace front brake pads | Replace front brake rotors | Replace brake fluid |
| Checklist of signage needs |
| Decorating Supplies furnished by Goedde Design - goeddedesign@charter.net - (509)782-2745 (h); (509)670-8012 (c) |
| Call Ken or Glenda for all of you float decorating needs! |
For more information about GarageTown - contact Christine Groenendaal, Manager - (253) 370-1710
Pacific Welding Supplies, LLC - contact Eric Konnersman, Manager (253) 383-3727
Omnisistem - for lighting, audio and sound effects needs - contact Chris Giannoulas (253) 395-9500 www.omnisistem.com
Interwest Metals, Inc. - Steel · Aluminum · Stainless - contact Doug Myers (253) 922-0200, (800) 828-3322
Marysville Everett Ceramic Tile - for flooring, tiling and countertop needs - contact Jodi Hiatt (360) 659-4706
Woodruff's Products - for recycling, welding, machinery and tools - contact John & Randy Woodruff (253) 848-0617
| Week 1 - December 28, 2009 - January 3, 2010 | Week 6 - February 1 - February 7, 2010 | Week 11 - March 8 - March 14, 2010 |
| Week 2 - January 4 - January 10, 2010 | Week 7 - February 8 - February 14, 2010 | Week 12 - March 15 - March 21, 2010 |
| Week 3 - January 11 - January 17, 2010 | Week 8 - February 15 - February 21, 2010 | Week 13 - March 22 - March 28, 2010 |
| Week 4 - January 18 - January 24, 2010 | Week 9 - February 22 - February 28, 2010 | Week 14 - March 29 - April 4, 2010 |
| Week 5 - January 25 - January 31, 2010 | Week 10 - March 1 - March 7, 2010 | Week 15 - April 5 - April 11, 2010 |
![]()